Industrial facilities

Upgrade and reconstruction "TRIATHLON" (4.500m2)
Upgrade and reconstruction "TRIATHLON" (4.500m2)
"Tigar Tyres" Serbia
HVAC & natural gas, technological fluids&gases, mechanical-technology design. Construction site: Pirot, Year: 2021
BROSE - PRODUCTION PLANT WITH AUXILIARY BUILDINGS - PHASE I (65,000 m2)
BROSE - PRODUCTION PLANT WITH AUXILIARY BUILDINGS - PHASE I (65,000 m2)
"BROSE" d.o.o. Beograd - Palilula
Design and supervision for thermotechnical installations (HVAC, technological cooling), internal gas installations, compressed air and nitrogen installations as well as technological projects. Place of construction: Palilula, Belgrade, Year: 2020-2021
Factory with a refrigerator for the production of frozen fruits and vegetables (8.500 m²)
Factory with a refrigerator for the production of frozen fruits and vegetables (8.500 m²)
P.P. "Sava Kovačević" A.D.
HVAC, N.Gas and Mechanical technology design. Construction site: Vrbas Year: 2016/17
Production plant for wind generators parts production  (26.000m²)
Production plant for wind generators parts production (26.000m²)
"Siemens" d.o.o.
HVAC Design and Supervision. Construction site: Subotica Year: 2016/17
Production hall with auxiliary buildings  II Phase (18.560m²)
Production hall with auxiliary buildings II Phase (18.560m²)
"ContiTech Fluid Serbia" d.o.o
HVAC, N.Gas and industrial cooling Design. Construction site: Subotica Year: 2016
Production complex
Production complex
"Patent Co" d.o.o
Steam boiler room Design, LPG Design and Mechanical technology design. Construction site: Misićevo Year: 2016
Mushrooms production hall (4.500m²)
Mushrooms production hall (4.500m²)
"Byosystem" d.o.o.
Heating and cooling design. Construction site: Kula Year: 2016
Production facility for pasta production (4.700m²)
Production facility for pasta production (4.700m²)
"Žitopromet-mlin" A.d. (Sentella)
Industrial cooling Design. Construction site: Senta Year: 2016
Production facility with auxiliary buildings  (2.000m²)
Production facility with auxiliary buildings (2.000m²)
City of Subotica
HVAC and N.Gas Design. Construction site: Subotica Year: 2016
Production complex
Production complex
"Masterplast YU" d.o.o.
HVAC Design, Mechanical technology design and Supervision. Construction site: Subotica Year: 2015/16
Production facility - Hall 3 (13.000m²)
Production facility - Hall 3 (13.000m²)
"R&W" d.o.o. za korisnika "Draexelmaier"
HVAC and N.Gas Design. Construction site: Zrenjanin Year: 2015
Production-storage facility (1.700m²)
Production-storage facility (1.700m²)
SZR "Bambino"
HVAC and N.Gas Design. Construction site: Subotica Year: 2015
This website uses cookies
We use cookies to personalise content and ads, to provide social media features and to analyse our traffic. We also share information about your use of our site with our social media, advertising and analytics partners who may combine it with other information that you’ve provided to them or that they’ve collected from your use of their services.